Upgrading the Burnaby water pump station

This upgrade included installing three new vertical turbine pump inlet barrels, each replacing an existing barrel, and three new vertical turbine pumps.

Also included was the installation of two new vertical multi-stage centrifugal pumping units. All existing piping and valving within the station was replaced.

Electrical work included the removal of the existing MCC and replacement with a new MCC, complete with new branch circuit wiring. Additionally, new instrumentation, two new magnetic flowmeters and eight pressure transmitters were also included.

The two existing generators received new alternators, new feeder conductors and generator control panels. The watermain outside the station was upgraded with 30 meters of 250mm diameter DI watermain.