Meeting increasing demands and supply

We installed two additional 250 HP Simflo vertical turbine pumps and associated discharge piping, as well as associated electrical works.

Opus DaytonKnight had designed the David Pump Station in 2005. It was originally constructed with two 250 HP four stage Simflo vertical turbine pumps with provision for two future pumps.

The station accepts potable water from the Metro Vancouver Regional Supply System (140m HGL) and conveys water to the Harper Reservoir (210m HGL).