Foreshore Protection

Design and construction management of rip-rap foreshore protection works

The top surface of the rip-rap is capped with a layer of crushed rock to provide a suitable walkway.

The rip-rap consists of a 150mm minus filter layer overlain with a 600mm minus rip-rap layer. The top surface of the work is capped with a 50mm minus layer of crushed rock to provide a suitable walkway along the top of the rip-rap.

We retained existing trees as part of the work.