Pump station replacement with a small footprint

Project challenges included construction of an 8m deep pile supported wet well within a small construction footprint, adjacent to a cycling and pedestrian thoroughfare.

As a result of the limited construction space the team needed to use sheet pile support for excavation. In addition, we designed the building to blend with the architectural character of Granville Island.