Odour control at the J.A.M.E.S facility in Abbortsford

We completed the design and construction management of a biofilter for odour control.

Opus Dayton Knight carried out the design and construction management of a biofilter for odour control at the J.A.M.E.S. facility.

Foul air from various process areas at the Centre are ducted to a plenum system under the biofilter media. The structure is covered to assist in controlling moisture in the media and to reducing weed growth.