Strawberry Water Booster Station Upgrade

Improvement to the MCC, a new flowmeter and a new PLC with an HMI

This project aimed to replace the existing booster station with a new one at a different location. The existing booster station would remain to provide flexibility.

The township’s Strawberry Water Booster Station conveys water from the Strawberry Reservoir and discharges into the Willoughby Reservoir.

The township’s Water Master Plan is to replace the existing Strawberry Booster Station with a new station at a different location. The existing Strawberry Booster Station would remain part of the system to provide flexibility and system redundancy.

The upgrades to the facility were to meet the required flexibility to prepare for that eventuality.