Pre-design, design, and construction management services

For this project we installed 2km of reinforced concrete pipe for combined sewer separation, in a high volume commuter corridor.

The trunk sewer was installed along Willingdon Avenue in the city of Burnaby which is a major traffic arterial road with a significant number of utilities. The trunk sewer was installed at depths up to 6 metres and required open cut crossings of Hastings Street, a high volume commuter transportation corridor.